




Mirror Letter Project – Printable A–Z Self-Portrait Art Activity
Turn letters into self-portraits! Kids design a letter that reflects their interests and self-understanding—with creativity, reflection, and confidence.
Pairs well with

Mirror Letter Project – Printable A–Z Self-Portrait Art Activity
Product Details
What’s Included
🖨️ 2 Printable Templates
- ✏️ Black & White Version – Kids can color, customize, and make each model their own.
- 🎨 Pre-Colored Version – For quick assembly with vibrant color already prepared.
🔤 Creative Writing & Drawing Space – Each model includes open areas where kids can draw or write words and pictures related to the featured letter.
🧾 Simple Folding & Assembly Rules – Clearly identified cut lines, fold lines, and glue tabs streamline construction. (Some models are easier to assemble than others. Adults will likely need to assist.)
Why You'll Love It
✅ Hands-On Alphabet Learning – Builds letter recognition, vocabulary, and phonics through play and creation.
✂️ Supports Fine Motor Skills – Scissor work, folding, and gluing strengthen early coordination and focus.
🧑🏫 Perfect for Classrooms, Homeschool, or Storytime – Assign one letter to each child or have students build the whole alphabet set over time.
🚀 Great for Display & Collecting – Kids love lining up their models to create a custom 3D Alphabet Parade—a tangible celebration of their learning!
How It Works
📥 Download instantly – No sign-up required.
🖨️ Print at home or school – Sized for 8.5x11 paper. Cardstock is ideal, but regular copy paper works too.
✏️ Color (if desired) – Use crayons, markers, or colored pencils.
✂️ Cut, fold, & glue – Follow the assembly rules to build your 3D model.
📚Build the full alphabet parade– Collect and display all 26 letter-themed models from Alphabet Parade. Use them to read along with the book!